AL-7 (US-11) over Gulf Creek

N of AL-53 (US-231) · County 115, Alabama · Built 2017 · 2 Lanes · 2,310 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

33.9019, -86.2479

This bridge is in worse condition than 38.3% of bridges in County 115. The average bridge in Alabama is 0 years old; this one is 9 years old.

Nearby Bridges

Bridge Details

Structure #
020489
Year Built
2017
Length
77.7 m (254.9 ft)
Max Span
25.9 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
2,310
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,772,000
Total Project Cost
$3,049,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.