COUNTY ROAD 37 over BRANCH OF COALFIRE CREEK

3.3 MI NORTH OF CR#35 · County 107, Alabama · Built 2006 · 2 Lanes · 180 vehicles/day

Overall
Good
Culvert
9
Excellent

Bridge Details

Structure #
019627
Year Built
2006
Length
7.6 m (24.9 ft)
Max Span
3.7 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
180
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$283,000
Total Project Cost
$311,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.