AL-6 over Branch

1.1 MI W of Reform · County 107, Alabama · Built 1980 · 4 Lanes · 7,158 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
012360
Year Built
1980
Length
6.4 m (21 ft)
Max Span
3 m
Lanes
4
Daily Traffic
7,158
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,310,000
Total Project Cost
$1,441,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.