CO. RD. 12 over BRANCH OF BON SECOUR RI.

0.3 MI. E. OF AL. HWY. 59 · County 003, Alabama · Built 2005 · 2 Lanes · 1,953 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
019541
Year Built
2005
Length
11.3 m (37.1 ft)
Max Span
3.7 m
Width
11.3 m (37.1 ft)
Lanes
2
Daily Traffic
1,953
Material
Concrete Continuous
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$438,000
Total Project Cost
$482,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.