SR 59 SB over BOGGY BRANCH

0.25 MI S C0 RD 10 · County 003, Alabama · Built 1976 · 2 Lanes · 17,450 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
011675
Year Built
1976
Length
41.5 m (136.2 ft)
Max Span
10.4 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
17,450
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,507,000
Total Project Cost
$1,658,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.