CR 41 over UT TO BEAR CREEK

1.4 MILES No. of US 280 · County 117, Alabama · Built 1958 · 2 Lanes · 41,000 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
019359
Year Built
1958
Length
7.5 m (24.6 ft)
Max Span
3.7 m
Lanes
2
Daily Traffic
41,000
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$745,000
Total Project Cost
$820,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.