EAGLE POINT CIRCLE over IVY BRANCH

400 SO. EAGLE CREST DR. · County 117, Alabama · Built 1998 · 2 Lanes · 600 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
018127
Year Built
1998
Length
6.8 m (22.3 ft)
Max Span
3 m
Lanes
2
Daily Traffic
600
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$618,000
Total Project Cost
$680,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.