4TH AVE SOUTH over EAST BRANCH

.1 MI S JCT 3RD AVE S · County 093, Alabama · Built 1996 · 2 Lanes · 200 vehicles/day

Overall
Fair
Deck
9
Excellent
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
018886
Year Built
1996
Length
17.7 m (58.1 ft)
Max Span
10.3 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
200
Material
Concrete
Design
Channel Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$458,000
Total Project Cost
$504,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.