3RD AVE N over EAST BRANCH

0.1 MI W JCT US 78 · County 093, Alabama · Built 1937 · 2 Lanes · 400 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
001568
Year Built
1937
Length
60.4 m (198.2 ft)
Max Span
11.9 m
Width
6.5 m (21.3 ft)
Lanes
2
Daily Traffic
400
Material
Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,019,000
Total Project Cost
$1,121,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.