SR-5 over US-78

Jasper · County 127, Alabama · Built 2024 · 2 Lanes · 10,932 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
018879
Year Built
2024
Length
39.6 m (129.9 ft)
Max Span
19.8 m
Width
17.8 m (58.4 ft)
Lanes
2
Daily Traffic
10,932
Material
Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,954,000
Total Project Cost
$2,149,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.