8 TH AVE over TANYARD CREEK

8 TH AVE * 19 TH ST · County 127, Alabama · Built 1948 · 2 Lanes · 300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
003190
Year Built
1948
Length
16.9 m (55.4 ft)
Max Span
8.4 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
300
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$426,000
Total Project Cost
$469,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.