I-22 over CR-47

12 MI E of US-43 · County 093, Alabama · Built 1997 · 2 Lanes · 12,834 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

33.992611, -87.787167

This bridge is in worse condition than 54.9% of bridges in County 093. The average bridge in Alabama is 0 years old; this one is 29 years old.

Nearby Bridges

Bridge Details

Structure #
018417
Year Built
1997
Length
59.7 m (195.9 ft)
Max Span
24.4 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
12,834
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,020,000
Total Project Cost
$2,222,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.