CR-68 over I-22

28.3 MP on I-22/CR-68 · County 093, Alabama · Built 1997 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 7 Good
Substructure 8 Very Good

Location

33.986628, -87.811064

This bridge is in worse condition than 71.8% of bridges in County 093. The average bridge in Alabama is 0 years old; this one is 29 years old.

Nearby Bridges

Bridge Details

Structure #
017205
Year Built
1997
Length
100.6 m (330.1 ft)
Max Span
28.9 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,089,000
Total Project Cost
$3,398,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.