US 80 WBL over CAHABA RIVER RELIEF NO.5
4.4 MI. W. OF AL 219 · County 047, Alabama · Built 2004 · 2 Lanes · 2,895 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.445, -87.156667
This bridge is in worse condition than 44.5% of bridges in County 047. The average bridge in Alabama is 0 years old; this one is 22 years old.
Nearby Bridges
US 80 WBL over CAHABA RIVER RELIEF#6
Built 2004
US 80 WBL over CAHABA RIVER RELIEF NO.4
Built 2004
US 80 WBL over CAHABA RIVER RELIEF #3
Built 2004
US 80 WBL over CHABA RIVER RELIEF #2
Built 2004
US 80 WBL over CAHABA RIVER RELIEF NO.1
Built 2004
US 80 over BRANCH
Built 1982
US 80 EBL over CAHABA RIVER
Built 1982
US 80 EBL over CAHABA RIVER RELIEF NO.1
Built 1982
US 80 EBL over CAHABA RIVER RELIEF NO.3
Built 1982
US 80 EBL over CAHABA RIVER RELIEFNO.2
Built 1982
Bridge Details
- Structure #
- 018023
- Year Built
- 2004
- Length
- 41.5 m (136.2 ft)
- Max Span
- 10.4 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 2,895
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,472,000
- Total Project Cost
- $1,619,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.