US 80 EBL over CAHABA RIVER RELIEF NO.1

5.4 MI.W.OF AL.219 · County 047, Alabama · Built 1982 · 2 Lanes · 2,450 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
012754
Year Built
1982
Length
82.9 m (272 ft)
Max Span
10.4 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
2,450
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,675,000
Total Project Cost
$2,943,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.