US 80 over CHEWACLA CREEK

3.3 MI. E. OF JCT US 29 · County 087, Alabama · Built 2005 · 2 Lanes · 2,820 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
017967
Year Built
2005
Length
129.5 m (424.9 ft)
Max Span
25.9 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
2,820
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,346,000
Total Project Cost
$4,781,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.