US 80 over GLASS MILL CREEK

5.7 MI. E. OF JCT US 29 · County 087, Alabama · Built 2005 · 2 Lanes · 2,510 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
017908
Year Built
2005
Length
48.8 m (160.1 ft)
Max Span
12.2 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
2,510
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,857,000
Total Project Cost
$2,043,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.