AL-269 over Mulberry Fork Warrior

Copeland Ferry · County 127, Alabama · Built 2008 · 2 Lanes · 2,577 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
017952
Year Built
2008
Length
283.5 m (930.1 ft)
Max Span
77.7 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
2,577
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,941,000
Total Project Cost
$9,835,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.