I-22 over Mulberry Fork Warrior

Barney Beach · County 127, Alabama · Built 2005 · 3 Lanes · 22,592 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
017789
Year Built
2005
Length
378 m (1240.2 ft)
Max Span
83.8 m
Width
17.9 m (58.7 ft)
Lanes
3
Daily Traffic
22,592
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$15,031,000
Total Project Cost
$16,534,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.