SR. 134 MP 8.121 over PEA RIVER RELIEF

3 MI.E.OF SR.189 · County 031, Alabama · Built 2003 · 2 Lanes · 3,940 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
017834
Year Built
2003
Length
150.9 m (495.1 ft)
Max Span
13.7 m
Width
14.1 m (46.3 ft)
Lanes
2
Daily Traffic
3,940
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,003,000
Total Project Cost
$5,503,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.