SR. 134 MP 8.363 over PEA RIVER

3 MI. E. SR. 189 · County 031, Alabama · Built 2003 · 2 Lanes · 3,940 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
017772
Year Built
2003
Length
123.4 m (404.9 ft)
Max Span
41.1 m
Width
14.1 m (46.3 ft)
Lanes
2
Daily Traffic
3,940
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,160,000
Total Project Cost
$4,576,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.