I-22 over Gulf Branch

3.2 MI. E of AL-233 · County 093, Alabama · Built 2004 · 2 Lanes · 13,401 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 7 Good
Substructure 7 Good

Location

33.95725, -87.651028

This bridge is in worse condition than 71.8% of bridges in County 093. The average bridge in Alabama is 0 years old; this one is 22 years old.

Nearby Bridges

Bridge Details

Structure #
017632
Year Built
2004
Length
172.7 m (566.6 ft)
Max Span
40.2 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
13,401
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,179,000
Total Project Cost
$5,697,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.