RODGER PHILLIPS RD over BRANCH

2.6 MI. E. US 43 · County 097, Alabama · Built 2001 · 2 Lanes · 420 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
017600
Year Built
2001
Length
150 m (492.1 ft)
Max Span
31.2 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
420
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$4,325,000
Total Project Cost
$4,758,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.