I-65 NB over MOBILE RIVER DELTA

5.5 MI N E US 43 · County 097, Alabama · Built 1980 · 2 Lanes · 12,571 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
012322
Year Built
1980
Length
9785.8 m (32105.6 ft)
Max Span
243.8 m
Width
12.7 m (41.7 ft)
Lanes
2
Daily Traffic
12,571
Material
Steel
Design
Arch - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$275,115,000
Total Project Cost
$302,627,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.