SR 54 MP. 11.312 over BRANCH

.3 MI. E. GENEVA CO. 10 · County 061, Alabama · Built 2001 · 2 Lanes · 950 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
017475
Year Built
2001
Length
6.5 m (21.3 ft)
Max Span
3.2 m
Lanes
2
Daily Traffic
950
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$541,000
Total Project Cost
$595,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.