SR 54 MP 11.025 over CORNER CREEK

.04 MI. E. GENEVA CO. 10 · County 061, Alabama · Built 2001 · 2 Lanes · 890 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
017418
Year Built
2001
Length
96 m (315 ft)
Max Span
24 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
890
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,038,000
Total Project Cost
$3,342,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.