AL-13 over Bear Creek

0.5M S JCT AL-172 · County 093, Alabama · Built 1998 · 2 Lanes · 5,413 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
017443
Year Built
1998
Length
138.7 m (455.1 ft)
Max Span
41.1 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
5,413
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,225,000
Total Project Cost
$4,648,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.