AL-13 over Flat Creek

1.5 Miles S JCT AL-172 · County 093, Alabama · Built 1998 · 2 Lanes · 5,675 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
017331
Year Built
1998
Length
49.9 m (163.7 ft)
Max Span
12.9 m
Width
12.7 m (41.7 ft)
Lanes
2
Daily Traffic
5,675
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,688,000
Total Project Cost
$1,857,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.