WESTERN BYPASS over BLACK WARRIOR RIVER

NORTHPORT-TUSCALOOSA · County 125, Alabama · Built 1998 · 4 Lanes · 8,104 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
017328
Year Built
1998
Length
292.9 m (961 ft)
Max Span
76.2 m
Width
19.2 m (63 ft)
Lanes
4
Daily Traffic
8,104
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
Private (other than railroad)
Last Inspected
N/A
Est. Improvement
$12,653,000
Total Project Cost
$13,918,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.