CO HWY 105 over CAHABA VALLEY CREEK

0.4MI N INDUSTRIAL PARK · County 117, Alabama · Built 1998 · 2 Lanes · 7,888 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
017091
Year Built
1998
Length
31.1 m (102 ft)
Max Span
9.8 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
7,888
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,249,000
Total Project Cost
$1,374,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.