AL - 261 over VULCAN MATL HAUL ROAD

3.5 MI N US 31 · County 117, Alabama · Built 1996 · 2 Lanes · 11,100 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
8
Very Good

Bridge Details

Structure #
016666
Year Built
1996
Length
51.8 m (169.9 ft)
Max Span
18.9 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
11,100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,957,000
Total Project Cost
$2,153,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.