U.S. 98 (SCENIC) over POINT CLEAR CREEK

1.3 MI. W. OF CO. RD. 32 · County 003, Alabama · Built 1997 · 2 Lanes · 5,931 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
017078
Year Built
1997
Length
10.4 m (34.1 ft)
Max Span
10.4 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
5,931
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$399,000
Total Project Cost
$439,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.