TURNOUTS @ US 98 over US 98 * MORPHY AVE

0.5 MI W OF MORPHY AVE · County 003, Alabama · Built 1995 · 2 Lanes · 21,618 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
016389
Year Built
1995
Length
6.7 m (22 ft)
Max Span
3 m
Lanes
2
Daily Traffic
21,618
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$16,433,000
Total Project Cost
$18,076,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.