SR 130 MP 8.899 over PEA RIVER

1.1MI E PIKE CO 83 · County 109, Alabama · Built 1999 · 2 Lanes · 680 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
017038
Year Built
1999
Length
384 m (1259.8 ft)
Max Span
32 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
680
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$11,059,000
Total Project Cost
$12,165,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.