SR 130 MP 5.614 over BUCKHORN CREEK

1.9 MI.E.PIKE CO. 85 · County 109, Alabama · Built 1993 · 2 Lanes · 900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
015756
Year Built
1993
Length
87.5 m (287.1 ft)
Max Span
12.5 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
900
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,802,000
Total Project Cost
$3,082,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.