BASHI RD over DRY CREEK

BASHI · County 129, Alabama · Built 1983 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
017030
Year Built
1983
Length
17.4 m (57.1 ft)
Max Span
5.8 m
Width
7.6 m (24.9 ft)
Lanes
2
Daily Traffic
100
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$402,000
Total Project Cost
$442,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.