DRY CREEK RD over DRY CREEK

BASHI · County 129, Alabama · Built 1983 · 2 Lanes · 100 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
4
Poor

Bridge Details

Structure #
017029
Year Built
1983
Length
11.6 m (38.1 ft)
Max Span
5.8 m
Width
5.3 m (17.4 ft)
Lanes
2
Daily Traffic
100
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$214,000
Total Project Cost
$235,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.