CO. RD. 65 over MAGNOLIA RIVER

1.2 MI. N. OF U. S. 98 · County 003, Alabama · Built 1996 · 2 Lanes · 3,405 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
016347
Year Built
1996
Length
31.1 m (102 ft)
Max Span
10.4 m
Width
10.2 m (33.5 ft)
Lanes
2
Daily Traffic
3,405
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$896,000
Total Project Cost
$986,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.