US 98 over MAGNOLIA RIVER

1.1 MI W CO 65 · County 003, Alabama · Built 1988 · 2 Lanes · 13,403 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
014586
Year Built
1988
Length
100 m (328.1 ft)
Max Span
12.5 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
13,403
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,147,000
Total Project Cost
$3,462,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.