US 72 SR 2 over RELIEF NO 1

2.1 MI WEST TENN ST LINE · County 071, Alabama · Built 1997 · 2 Lanes · 10,719 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
016266
Year Built
1997
Length
24.4 m (80.1 ft)
Max Span
23.3 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
10,719
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$953,000
Total Project Cost
$1,048,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.