U.S. 72 over RELIEF NO 2

1.7 MI WEST TENN ST LINE · County 071, Alabama · Built 1997 · 3 Lanes · 10,719 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
016230
Year Built
1997
Length
24.4 m (80.1 ft)
Max Span
23.3 m
Width
16.6 m (54.5 ft)
Lanes
3
Daily Traffic
10,719
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,226,000
Total Project Cost
$1,349,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.