US231; US431; SR1 over DRAINAGE EASEMENT

JCT US 231 * OAKWOOD AVE · County 089, Alabama · Built 1993 · 10 Lanes · 44,349 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
016176
Year Built
1993
Length
6.7 m (22 ft)
Max Span
3 m
Lanes
10
Daily Traffic
44,349
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,880,000
Total Project Cost
$5,368,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.