EAST ARBOR over BRANCH

OAKWOOD * EAST ARBOR · County 089, Alabama · Built 1957 · 2 Lanes · 900 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
006014
Year Built
1957
Length
6.4 m (21 ft)
Max Span
3 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
900
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$291,000
Total Project Cost
$320,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.