SR 104 over PERONE BRANCH

6 MI E US 98 · County 003, Alabama · Built 1993 · 2 Lanes · 9,964 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
015739
Year Built
1993
Length
13.1 m (43 ft)
Max Span
4.3 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
9,964
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$504,000
Total Project Cost
$554,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.