SUGAR CR EST RD over CAIRO BRANCH

SEC24 T2S R6W · County 083, Alabama · Built 1996 · 1 Lanes · 40 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
015731
Year Built
1996
Length
7.3 m (24 ft)
Max Span
7.3 m
Width
6.1 m (20 ft)
Lanes
1
Daily Traffic
40
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$189,000
Total Project Cost
$208,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.