CAIRO HOLLOW RD over CAIRO BRANCH

SEC23 T2S R6W · County 083, Alabama · Built 1947 · 2 Lanes · 1,590 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
003066
Year Built
1947
Length
6.7 m (22 ft)
Max Span
3 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
1,590
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$339,000
Total Project Cost
$373,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.