CR- 37 over I-22

20.8 on I-22/CR-37 · County 093, Alabama · Built 1991 · 2 Lanes · 100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

34.047467, -87.916108

This bridge is in worse condition than 54.9% of bridges in County 093. The average bridge in Alabama is 0 years old; this one is 35 years old.

Nearby Bridges

Bridge Details

Structure #
015718
Year Built
1991
Length
93.6 m (307.1 ft)
Max Span
29.3 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,122,000
Total Project Cost
$2,334,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.