CR-2 over I-22

19.9 MP on I-22/CR-2 · County 093, Alabama · Built 1992 · 2 Lanes · 121 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
015717
Year Built
1992
Length
91.4 m (299.9 ft)
Max Span
27.4 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
121
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,079,000
Total Project Cost
$2,287,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.