AL 39 over FACTORY CRK.

4.5 MI.S.OF GAINSVILLE · County 119, Alabama · Built 1992 · 2 Lanes · 830 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
015550
Year Built
1992
Length
53.6 m (175.9 ft)
Max Span
12.5 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
830
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,885,000
Total Project Cost
$2,074,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.