CR-21 over I-59 (MP 24.8)

1.3 MI.N. OF CO.RD 20 · County 119, Alabama · Built 1974 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
011119
Year Built
1974
Length
115.2 m (378 ft)
Max Span
32 m
Width
9 m (29.5 ft)
Lanes
2
Daily Traffic
100
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,464,000
Total Project Cost
$2,710,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.